The station underwent a refurbishment programme during 2008, which sought to replace the platform name boards, eliminate the waiting shelters, and apply a new colour scheme. The signal box remains to control the pedestrian access to the level crossing. © David Glasspool
The prefabricated concrete waiting shelters were eliminated and on their sites emerged glazed shelters of a standardised design. © David Glasspool
Even the prefabricated concrete platform backing has not escaped the prevailing ''battleship grey'' colour scheme. Despite the leafy surroundings, there is constant noise at the station, generated by the nearby Dartford Crossing. © David Glasspool
Return to the Kent Rail Homepage or alternatively, check for Updates.
Website & Copyright information - Links - Contact the Webmaster